125 London Wall

125 London Wall

Following the merger of the law firms CMS, Nabarro and Olswang, we are working in collaboration with Parkeray at their existing offices in 125 London Wall floors 12-18. The existing Cat B office fit out is to be modified and reverted back to a CAT A office fit out.

125 London Wall

Following the merger of the law firms CMS, Nabarro and Olswang, we are working in collaboration with Parkeray at their existing offices in 125 London Wall floors 12-18. The existing Cat B office fit out is to be modified and reverted back to a CAT A office fit out.

The modification works will include:

  • Tenancy split for sub letting
  • Validation of existing services
  • Modifications to existing mechanical services
  • New and modifications to the existing lighting layout to comply with the requirements of CIBSE LG7
  • New toilet facilities